SSM 24 Block making machine deliver in sukkhar motorway project

ssm 24 block machine deliver in sukkar

BLOCK MACHINE IN SUKKHAR

 

 

SSM 24 Block & Paver Plant Delivered to Jora Crete, Sukkur Motorway Project

Powering the Sukkur Motorway – A Testament to Trust

In 2019, at the height of the Sukkur–Multan Motorway (M‑5) construction – a flagship project of the China‑Pakistan Economic Corridor (CPEC) – the demand for high‑quality concrete pavers, blocks, and curbstones was unprecedented. Jora Crete, a trusted construction materials supplier, was awarded a critical contract to supply these products for the motorway’s rest areas, service stations, and access roads.

To meet the massive volume and strict quality standards, Jora Crete chose Silver Steel Mills to deliver a fully automatic SSM 24 block and paver plant. The plant was installed near the motorway alignment in Sukkur and became the backbone of Jora Crete’s production – delivering 24,000 pavers, 12,000 blocks, and 4,000 curbstones daily.

This project not only showcases the capability of our machinery but also the trust that industry leaders place in Silver Steel Mills.


The Challenge – Meeting CPEC‑Grade Specifications

The Sukkur Motorway project demanded:

  • High‑volume production – Thousands of pavers and blocks needed every day.

  • Uncompromising quality – Products had to pass NHA (National Highway Authority) lab tests.

  • Fast delivery – The motorway schedule was tight; any supply delay would cost millions.

  • Durability – Pavers and curbstones had to withstand heavy truck traffic and extreme temperatures.

Jora Crete had previously relied on multiple small suppliers, but quality was inconsistent and volumes insufficient. They needed a captive, high‑capacity plant that could produce everything on site.

After evaluating several manufacturers, they chose Silver Steel Mills because of our proven track record with CPEC contractors (CSCEC) and our reputation for robust, reliable machinery.


The Solution – Complete SSM 24 Plant

We delivered, installed, and commissioned a complete SSM 24 fully automatic plant, including:

1. Main Block Machine – SSM 24

Parameter Specification
Machine type Fully automatic (PLC control)
Cycle time 18‑22 seconds
Hydraulic pressure 250 tons
Vibration motors 15 HP × 2 (dual, high‑frequency)
Total power 40‑45 kW

2. Batching System (Digital Weighing)

  • 3 aggregate bins – for sand, 6 mm crush, 10 mm crush.

  • 50‑ton cement silo with dust collector.

  • Digital load cells – accurate weighing of all materials.

  • Water weighing system.

3. Planetary Mixer

  • Batch capacity : 1000 kg.

  • Motor power : 30 kW.

  • Homogeneous mixing in 60‑90 seconds.

4. Conveyor Belt

  • Length : 10 m heavy‑duty rubber belt with cleats.

  • Motor : 5 HP gear motor.

5. Automatic Stacker

  • Pallet stacker with hydraulic lift.

  • Reduces manual labour and product damage.

6. Moulds Supplied

  • Paver mould (60 mm) – for interlocking tiles.

  • Hollow block mould (6″×8″×12″).

  • Curbstone mould (12″×14″).

The plant was erected on a purpose‑built concrete foundation, with our engineers supervising every step. Jora Crete’s operators were trained on site.


Production Capacity – Real Numbers

After commissioning, the SSM 24 plant consistently achieved (two shifts, 16 hours):

Product Daily Output
Interlocking pavers (60 mm) 24,000 pieces
Hollow / solid blocks (6″×8″×12″) 12,000 blocks
Curbstones (road edges) 4,000 pieces

This output was more than enough to supply the motorway’s rest areas, toll plazas, and service stations. Jora Crete also supplied blocks for ancillary structures (security posts, warehouses).

“The SSM 24 plant never missed a deadline. Even during the peak summer months (50°C), the machine kept running. The pavers were consistently strong – passing every NHA lab test. Silver Steel Mills became our trusted partner. We have since ordered another plant.”
– Project Director, Jora Crete, Sukkur


Key Features That Won Jora Crete’s Trust

1. High Production – 24/7 Reliability

The SSM 24’s robust construction allowed it to run two full shifts without overheating or breakdowns. The dual vibration motors and heavy‑duty hydraulic system handled the toughest concrete mixes.

2. Consistent Quality – Lab‑Tested Pass

Every batch of pavers and blocks was tested for compressive strength. Results consistently exceeded NHA requirements:

  • Paver strength : 5,200 – 5,800 PSI

  • Block strength : 4,500 – 5,000 PSI

  • Curbstone strength : 5,000+ PSI

3. Integrated System – Reduced Labour

The batching system + mixer + conveyor + stacker worked as a seamless line. Only 3‑4 operators were needed per shift – far less than manual or semi‑automatic plants.

4. Local Support – Fast Response

When a minor issue arose (a belt misalignment), Silver Steel Mills’ technician was on site within 24 hours. Spare parts were available from our Gujranwala factory.


Impact on the Sukkur Motorway Project

The SSM 24 plant enabled Jora Crete to:

  • Supply on time – Never delayed a single delivery.

  • Reduce costs – In‑house production cut material costs by 40%.

  • Earn repeat orders – Motorway contractors requested more pavers for additional sections.

  • Create local jobs – Trained Sukkur residents as plant operators.

The motorway was completed ahead of schedule, and the pavers installed from Jora Crete’s plant remain in excellent condition today (2025).


A Symbol of Trust – Why Clients Choose Silver Steel Mills

Jora Crete’s experience reflects what hundreds of clients have discovered: Silver Steel Mills delivers.

  • Proven machinery – SSM series plants are working across CPEC, defence, housing schemes, and industrial projects.

  • Complete turnkey – From foundation drawings to operator training, we handle everything.

  • Local manufacturing – Spare parts and service are always available.

  • Competitive pricing – 30‑40% less than imported equivalents.

  • Long‑term relationships – Jora Crete has since purchased additional plants.

“We trusted Silver Steel Mills with our most critical project – the Sukkur Motorway. They did not disappoint. Their machine, their team, their commitment – all top class.”
– Owner, Jora Crete


Technical Snapshot – SSM 24 (Jora Crete Configuration)

Parameter Specification
Machine model SSM 24 fully automatic
Cycle time 18‑22 seconds
Hydraulic pressure 250 tons
Vibration 15 HP × 2 dual motors
Mixer Planetary, 1000 kg
Batching system 3 bins + 50‑ton silo + digital load cells
Conveyor 10 m belt
Stacker Automatic pallet stacker
Daily output 24,000 pavers / 12,000 blocks / 4,000 curbstones
Installation year 2019
Client Jora Crete, Sukkur (Motorway Project)

Conclusion – Building Pakistan’s Arteries

The SSM 24 plant at Jora Crete played a vital role in the Sukkur Motorway – one of Pakistan’s most important infrastructure projects. It stands as a testament to what local engineering can achieve when combined with international standards and unwavering client support.

 

 

Supplying Integrated SSM 35 Fully Automated Block Plant with Batching System & Custom Steel Shed Building for Gulf Crete, Karachi

Heavy infrastructure development, commercial concrete supply grids, aur large-scale concrete asset manufacturing mein industrial production capacity aur structural engineering ka integrated hona sab se critical factor hota hai. Silver Steel Mills (SSM) ne Karachi mein operational leading enterprise Gulf Crete ki massive high-volume output demands aur automated infrastructure requirements ko facilitate karne ke liye apni elite industrial range ka sab se power-packed unit SSM 35 Fully Automated Concrete Block & Paver Making Plant successfully deliver, fabricate, aur install kiya hai.

Gulf Crete Karachi ke is mega project ke liye Silver Steel Mills ne sirf machinery supply nahi ki, balkay aik complete heavy industrial engineering ecosystem deploy kiya hai. Is solution mein high-capacity automatic block manufacturing line ke sath sath computerized aggregate batching plant aur plant operation ko weather-safe rakhne ke liye complete Pre-Engineered Steel Building Roof Shed (PEB) ki design engineering, fabrication, aur erection bhi shamil hai.

🛠️ Integrated Plant Ecosystem & Heavy-Duty Structural Components

Gulf Crete Karachi ka yeh plant manufacturing automation, material control, aur civil engineering ka aik perfect vertical layout hai jise niche diye gaye premium industrial parameters par design kiya gaya hai:

  • SSM 35 Heavy-Duty Main Machine Unit: Hamari machinery fleet ka aik intehai powerful aur advanced model jo synchronized ultra-high hydraulic pressure aur localized intense vibration technology par kaam karta hai. Yeh system concrete components ko zero-void microstructures faraham karta hai jo coastal heavy-load environments ke liye mandatory hain.

  • Computerized Automated Batching Plant System: Is heavy plant layout ke sath custom integrated multi-bin aggregate batching setup shamil hai. Yeh system raw materials (cement, aggregates, sand, water, aur additives) ki precise weight proportioning aur moisture control computerized sensors ke zariye khud karta hai, jise concrete mix ki commercial quality aur high-grade compression standards har batch mein exact barqarar rehte hain.

  • Custom Steel Building Roof Shed (PEB Structural Framework): Complete plant machinery layout, automated conveyors, aur batching zones ko weather hazards, heavy winds, aur coastal humidity se long-term protect karne ke liye Silver Steel Mills ne custom pre-engineered steel shed structural building (PEB) khud fabricate aur erect kar ke di hai. High-tensile steel frame se bani yeh building pooray plant setup ko un-interrupted 24/7 working environment provide karti hai.

  • Automated Material Handling & Conveyor Line: Raw material handling se lekar high-speed automated discharge tak, heavy conveyor belts aur automatic electronic systems ke zariye material flow ko optimized kiya gaya hai taake labor cost minimize aur output speed maximize ho sake.

📊 Industrial Capacity & Production Matrix (SSM 35 — Gulf Crete Karachi)

Karachi mein Gulf Crete par lagaya gaya yeh machinery setup Silver Steel Mills ki unmatched production capacity aur heavy footprint ka muftakhir suboot hai. Is automated multi-ton plant ki daily output capability ka mukammal matrix niche darj hai:

Manufactured Concrete Component Daily Industrial Production Output Capacity Engineering Target & Utility Application
High-Strength Interlocking Pavers 35,000 Pavers / Day Heavy commercial port yards, logistic terminals, container storage tracks, and urban pavements
Standard Concrete Blocks 15,000 Blocks / Day Commercial industrial warehouses, high-load factory retaining units, and mega structural civil frameworks
Heavy-Duty Road Curbstones 4,000 Curbstones / Day High-performance highway borders, central road margins, and checkpoint security perimeters

🛡️ Partnering with Corporate & Defense Giants for National Progress

Gulf Crete Karachi ke sath kiya gaya yeh highly integrated multi-dimensional engineering project hamari un elite engineering collaborations ka hissa hai jo hum continuous basis par scale karte aa rahe hain. Silver Steel Mills hamesha se Frontier Works Organisation (FWO), Pakistan Army, Pakistan Air Force (PAF), aur China State Construction Engineering Corporation (CSCEC) jaise mulk ke sab se bade infrastructure, defense, aur corporate giants ke sath direct manufacturing back-end partner ke taur par kaam karne par fahr mehsoos karta hai.

Humne har complex industrial, marine, aur rugged environment mein chalne wali highly reliable engineering machinery, pre-engineered steel buildings (PEBs), aur automated concrete plants design kar ke yeh sabit kiya hai ke hum sirf machine manufacturing nahi karte, balkay Pakistan ke har strategic aur commercial zone ki tarraqi mein asset-owning manufacturers ke taur par structural infrastructure provide karte hain.