Block Making Machine Diamer-Bhasha Dam

Block Machine Installation Project – Bhasha Dam

High-Capacity Block Machine Delivered for National Infrastructure – Bhasha Dam

In 2021, Silver Steel Mills achieved another milestone by successfully delivering and installing a high-performance block making machine at the Bhasha Dam Project site, commissioned by the Frontier Works Organization (FWO) — a prestigious engineering arm of the Pakistan Armed Forces.

The Bhasha Dam project is one of Pakistan’s largest infrastructure undertakings, requiring massive-scale construction materials, especially for retaining walls, channels, and base structures. After extensive evaluations and comparison with international machinery, FWO selected Silver Steel Mills for our rugged and proven GT block machine model, designed to operate under tough environmental and terrain conditions.

The Silver Steel Mills team demonstrated unmatched professionalism. Their block machine performed exceptionally well in rough terrains with non-stop production. Compared to foreign options,
their machines were better priced, durable, and perfectly aligned with our site needs. We're satisfied with the quality and performance.

 C/o Altaaf sb

Features of Project

The machine was delivered on-site, and our team ensured professional installation, alignment, and test production, which met all quality control and performance benchmarks set by the FWO engineering division.

 

  • Heavy-Duty GT Block Machine with Extended Mold Set

  • Built for High Volume Concrete Production

  • Special Weather-Proof Hydraulic and Vibration System

  • Remote Location Assembly Support

  • Custom Mold Design for Retaining Wall Blocks

  • Complete On-Site Training for FWO Operators

Heavy-Duty GT Block
Custom Mold Design
Quality Control System
Prepare Documentation
Brand Consistency
High Volume Concrete
portfolio-single-col-img2

Working Process

01
Step

Design and Planning

The machine and mold configuration were specifically designed to match Bhasha Dam’s construction requirements, ensuring compatibility with their project timeline and structure design.
02
Step

Component Sourcing

Premium-grade components were sourced for durability, including high-performance vibrators and German-grade hydraulic units for non-stop operation in remote, rugged terrain.
03
Step

Testing and Quality

All systems were rigorously tested in-house before dispatch. A second phase of performance validation was done post-installation at the dam site under live load conditions.
04
Step

Final Assembly

Silver Steel Mills’ technicians coordinated with FWO engineers for on-site installation, system calibration, and operational handover. Full training sessions were provided to FWO staff for independent usage.

Other Speciality

  • Specialist in Government and Infrastructure Projects

  • Rapid Deployment of Equipment to Remote Sites

  • Extended Warranty and Spare Support to Military & Government Clients

  • Experienced Team for High-Security Zones

  • Customization for Specific Engineering Requirements

Project Information

Silver Steel Mills achieved another milestone by successfully delivering and installing a high-performance block making machine at the Bhasha Dam Project site

Client Name

FWO

Category

Start Time

21 MAR 2021

End Time

14 APR 2021

Budget

Custom

Location

Gilgit, Paskitan