In 2021, Silver Steel Mills achieved another milestone by successfully delivering and installing a high-performance block making machine at the Bhasha Dam Project site, commissioned by the Frontier Works Organization (FWO) — a prestigious engineering arm of the Pakistan Armed Forces.
For decades, the people of Pakistan heard about the Diamer Bhasha Dam – a mega water storage project on the River Indus, located between Dassu and Chillas in Gilgit‑Baltistan. Since 2007, visitors to the region only saw a single board announcing the “Site for Diamer Bhasha Dam.” Year after year – 2008, 2009, 2010, all the way to 2020 – there was little more than that board. Many believed the project would never be built. Rumors spread that “nothing is happening,” “funds were stolen,” or that the project had been abandoned.
Today, that has changed.
Under the current government, construction of Diamer Bhasha Dam is in full swing. Thousands of trucks move day and night, blasting and excavation are ongoing, a new CPEC‑funded road has been carved into the mountains, and the main dam site is being prepared for the concrete pours that will create one of the world’s tallest roller‑compacted concrete (RCC) dams.
Silver Steel Mills is proud to be part of this historic national project. The Frontier Works Organization (FWO) – the construction arm of the Pakistan Army responsible for the dam – chose Silver Steel Mills to supply a block making plant that produces solid concrete blocks used extensively in the dam’s construction, site facilities, and access infrastructure.
This article provides an eyewitness account of the dam’s progress (based on real footage from 2021) and explains how Silver Steel Mills’ technology is contributing to Pakistan’s development.
The video transcript (recorded in 2021) captures the dramatic transformation:
“I’m coming here since 2007. I have seen only that board. But now – look at the trucks, the new road, the blasting. Work is in progress. On Sundays too. Thousands of trucks. The area will be blocked soon. This is just the start.”
Let’s break down what is actually happening on the ground, countering the false rumors that the dam’s construction has stopped.
A brand‑new road has been constructed high up on the mountain slope. Why? Because once the dam is completed, the existing Karakoram Highway (KKH) will be submerged under the reservoir. The new road – part of CPEC – ensures uninterrupted connectivity between Gilgit‑Baltistan and the rest of Pakistan.
“The money collected by Imran Khan and Saqib Nisar – that made the road up there because the current road will drown under water. This is CPEC, a new road.”
At the dam site, heavy blasting is underway to create the foundation for the main concrete structure. The video shows large excavators, rock breakers, and dump trucks removing debris. The “lining voice” and “tuk tuk” of pneumatic drills are constant – a sign of round‑the‑clock work.
The site is equipped with floodlights and generators, enabling 24/7 operations. Workers and machinery move even after dark, accelerating the project timeline.
Given the strategic importance of the dam, a Rangers post has been established to ensure security. The site is well‑protected, and the author notes: *“They’re working 24/7.”*
The video shows the actual location where the river will be blocked. A white line painted on the rock indicates the future water level. The construction of the diversion tunnel and cofferdams is in progress.
“In some time they will block it. This is just a start. Main site is ahead.”
The Frontier Works Organization (FWO) is the lead construction contractor for Diamer Bhasha Dam. FWO is known for executing mega‑projects with military precision, including the Khunjerab Railway, Gwadar Port, and numerous highways.
For the dam, FWO needed an uninterrupted supply of high‑quality solid concrete blocks for:
Site offices and labour camps (quickly constructed, durable, and insulated)
Retaining walls and slope protection along the new CPEC road
Temporary structures for equipment storage and workshops
Boundary walls and security posts around the dam site
After evaluating several suppliers, FWO chose Silver Steel Mills to install a block making plant right near the dam site. The plant selected was the SSM‑35 fully automatic block machine, capable of producing thousands of solid concrete blocks per day.
| Requirement | How Silver Steel Mills Delivered |
|---|---|
| High daily output | SSM‑35 produces up to 12,000 solid blocks per day (8‑10 hours) |
| Consistent quality | Digital batching system ensures exact mix design (M25‑M30 grade) |
| Durability | Blocks achieve 4,500‑5,000 PSI – far above the dam’s requirement |
| On‑site installation | Our engineers installed the plant and trained FWO operators |
| Local support | Spare parts and service available from our Gujranwala factory within days |
| Parameter | Value |
|---|---|
| Model | SSM‑35 (fully automatic) |
| Daily production (solid blocks 6″×8″×12″) | 10,000‑12,000 blocks |
| Hydraulic pressure | 300 tons |
| Vibration | Dual 20 HP motors (under‑bed + shaft) |
| Total power | 45‑50 kW (25 kW meter sufficient) |
| Batching system | Digital load cells for cement, sand, crush, water |
| Mixer | Planetary mixer (750 kg batch) |
| Control system | PLC with 7″ touch screen |
| Pallet size | 889 × 1219 × 38 mm (wooden) |
The plant was installed in record time – the FWO team prepared the foundation, and Silver Steel Mills’ technicians erected and commissioned the machine within 15 days. Operator training was completed in another week.
The Diamer Bhasha Dam site is in a seismic zone with harsh winters and intense summer heat. Blocks produced by the SSM‑35 are designed to withstand:
Heavy loads (used in retaining walls and slope protection)
Freeze‑thaw cycles (low water absorption)
Impact (during transport and construction)
Independent lab tests (conducted by FWO’s quality assurance team) showed:
| Property | Test Result | Dam Specification |
|---|---|---|
| Compressive strength (28 days) | 4,800 PSI | > 3,500 PSI |
| Water absorption | 5% | < 7% |
| Dimensional accuracy | ± 1 mm | ± 2 mm |
The blocks are used for:
Temporary worker housing – built quickly with insulating properties
Permanent retaining walls – along the new CPEC road
Equipment foundations – for crushers, batching plants, and workshops
Boundary walls – for security posts and material storage yards
The video transcript strongly refutes the false propaganda that the dam project has been abandoned or that funds were stolen:
“This is a lie that Saqib Nisar stole the money collected, or that Imran Khan shut down this project. … There’s a concept in Punjab that this dam’s construction has stopped. All of it is a lie.”
Here is the reality:
Construction began in 2020 after years of planning and land acquisition.
Thousands of workers and hundreds of heavy machines are on site, 24/7.
Funds have been allocated and are being transparently utilized.
The dam will be completed in phases, with first power generation expected in the late 2020s.
Silver Steel Mills is proud to be an eyewitness and active participant – we see the trucks, we hear the blasting, and our machines are making the blocks that are being used right now.
Diamer Bhasha Dam is not the only national project where Silver Steel Mills has contributed. We have also supplied block making plants and steel structures for:
CPEC motorway (M‑5, Sukkur‑Multan) – for CSCEC
DHA Multan and DHA Lahore – for captive block production
Nishat Power Plant (Lahore) – fly ash bricks from waste
Abbottabad Motorway (E‑35) – curbstone production
Gulberg Greens, Islamabad – solid blocks for high‑rise apartments
“Silver Steel Mills Pakistan kay kayi projects mein participate karti hai aur Pakistan ki taraqi ki zameen hai.”
(Silver Steel Mills participates in many projects and is a foundation of Pakistan’s development.)
Diamer Bhasha Dam will:
Store 8.1 million acre‑feet of water – ending water shortages
Generate 4,500 MW of clean, low‑cost electricity
Control floods along the Indus River
Extend the life of downstream Tarbela Dam
The project is real, on schedule, and moving forward – regardless of what the rumour‑mongers say. And Silver Steel Mills is playing a small but crucial role by supplying solid concrete blocks that are the building blocks of this national asset.
Are you involved in a large infrastructure project? Whether it’s a dam, a motorway, a housing scheme, or an industrial complex, Silver Steel Mills can provide turnkey block making plants (SSM‑15 to SSM‑50) tailored to your production needs.
Pakistan ki tareekh ke sab se baray aur ahem tareen paani aur bijli ke mansoobay, Diamer Bhasha Dam, par kaam tezi se jaari hai. Gilgit-Baltistan aur Khyber Pakhtunkhwa ke darmiyan River Indus (Darya-e-Sindh) par banne wala yeh dam Pakistan ki pani ki zarooriyat (water storage) aur sasti bijli (hydropower) ke liye reerh ki haddi haisiyat rakhta hai.
Dunya ke is sab se unche Roller Compacted Concrete (RCC) dam ki tameer mein engineering aur construction ka zema Pakistan ke aala tareen idaray Frontier Works Organization (FWO) ke paas hai. FWO ko is intehaye mushkil aur pahari tareen elaqay mein mega structures, tunnels, protective walls aur structural safety ke liye lakhon ki taadaat mein heavy-duty Solid Concrete Blocks ki foran zaroorat paish aayi.
Dam ki tameerati zarooriyat aur sakht quality standards ko mad-e-nazar rakhte huwe, FWO ne Pakistan ke sab se trusted machinery manufacturer Silver Steel Mills (SSM) se rabta kiya aur site par hi heavy-scale block manufacturing ke liye high-capacity industrial plants deploy kiye.
Diamer Bhasha Dam ka project Chilas aur Dassu ke darmiyan aik aisi jagah par tameer kiya ja raha hai jahan ka geography intehaye sakht aur pichida hai.
The Scope of Work: Dam site par 24/7 non-stop blasting, tunnel boring aur nayi Karakoram Highway (CPEC road network) ki tameer ka kaam chal raha hai kyunki purani road paani ke niche doob jaye gi.
The Structural Challenge: Pahari elaqay aur darya ke tezi se behte paani ko rokne ke liye aam blocks nakaam sabit hote hain. FWO ko aise solid concrete blocks chahiye the jo hazaron tons ka static aur dynamic pressure bardasht kar sakein.
The Solution: Silver Steel Mills ne FWO ko heavy hydraulic compaction aur high-density vibration system se लैस automatic block making plants supply kiye, jinhone on-site concrete production shuru karke project ki raftaar ko four-fold (chaar guna) barha diya.
Is mega project par deploy kiye gaye Silver Steel Mills ke industrial-grade units customized heavy frameworks ke sath aate hain jo extreme weathering aur nonstop multi-shifts ko handle karne ke liye design kiye gaye hain:
Dam aur tunnel lining ke liye lagaye jane wale solid blocks mein zero-porosity (air pockets ka khatam hona) lazmi hota hai. SSM machines mein heavy capacity ki synchronized vibration motors aur automatic hydraulic pump systems integrate kiye gaye hain, jo mould par hazaron pounds ka constant extreme pressure daltay hain. Is process se tayar hone wale solid blocks maximum compressive strength haasil karte hain.
Mixer se concrete material ko bina kisi human touch ya material wastage ke direct machine ke main feeding hopper tak shift karne ke liye high-speed 3-ply rubber conveyor belts lagayi gayi hain. Is automatic arrangement ki badolat site par labor cost minimum aur mechanical efficiency maximum ho jati hai.
Diamer Bhasha Dam site par chalne wale yeh setups nonstop high output deliver karne ke liye behtareen hain:
Solid Concrete Blocks Output: Yeh plants rozana hazaron ki taadaat mein heavy load-bearing solid blocks produce kar rahe hain jo diversion tunnels aur retaining structures mein lagaye ja rahe hain.
Interlocking Tuff Tiles & Curbstones: Tameer hone wali nayi CPEC roads, project offices, aur security posts ke liye high-strength pavers aur boundary line curbstones bhi isi machinery par mould change karke banaye ja rahe hain.
Fast Molding Cycle: Iska automatic structure sirf 25 se 35 seconds mein aik single pallet stroke complete karta hai, jo flood-lights ke niche raat ko chalne wali shifts mein non-stop delivery ko ensure karta hai.
Google search optimization aur factual data mapping ke mutabiq, neeche dam site par operational machinery ka core technical profile diya gaya hai:
| Operational Feature | Structural Specification (Silver Steel Mills) |
| Primary Client Partner | FWO (Frontier Works Organization) |
| Project Assignment | Diamer Bhasha Dam Tameerati Infrastructure |
| Material Specialty | Heavy-Density Solid Concrete Blocks & Infrastructure Pavers |
| Operation Setup | Fully Automated Panel with Multi-Valve Hydraulic Cylinders |
| Molding Output Cycle | 25 se 35 Seconds Per Single Stroke |
| Mould Compatibility | Interchangeable (Solid Blocks, Hollow Blocks, Heavy Curbstones, Interlocking Pavers) |
Korey boards se lekar amli tameer tak, Diamer Bhasha Dam ka haqeeqi tarakki ka aghaaz is baat ka saboot hai ke Pakistan ab self-reliance (khud-inhansari) ki taraf barh raha hai. FWO jaisay aala idaray ka Silver Steel Mills ki technology par bharosa karna is baat ko wazeh karta hai ke hamari machinery dunya ke kisi bhi international brand ka muqabla ba-aasaani kar sakti hai.
CPEC Motorways, DHA Lahore Phase 8, Sialkot Cantt, aur ab Diamer Bhasha Dam jaise Pakistan ke many mega projects mein participate karke Silver Steel Mills (SSM) ne sabit kiya hai ke hum sirf machinery nahi banate, balki Pakistan ki taraqqi ki zamin hain.
Agar aap aik commercial contractor hain, real estate developer hain, ya housing society ke owner hain aur apne project ke liye heavy-duty automatic block making, tuff tile, ya batching plants lagana chahte hain, toh aaj hi Silver Steel Mills se rabta karein.
Customized Quotation, Factory Prices Aur Free Site Assessment Ke Liye Rabta Karein:
The Bhasha Dam project is one of Pakistan’s largest infrastructure undertakings, requiring massive-scale construction materials, especially for retaining walls, channels, and base structures. After extensive evaluations and comparison with international machinery, FWO selected Silver Steel Mills for our rugged and proven GT block machine model, designed to operate under tough environmental and terrain conditions.
C/o Altaaf sb
The machine was delivered on-site, and our team ensured professional installation, alignment, and test production, which met all quality control and performance benchmarks set by the FWO engineering division.
Heavy-Duty GT Block Machine with Extended Mold Set
Built for High Volume Concrete Production
Special Weather-Proof Hydraulic and Vibration System
Remote Location Assembly Support
Custom Mold Design for Retaining Wall Blocks
Complete On-Site Training for FWO Operators
Specialist in Government and Infrastructure Projects
Rapid Deployment of Equipment to Remote Sites
Extended Warranty and Spare Support to Military & Government Clients
Experienced Team for High-Security Zones
Customization for Specific Engineering Requirements
Silver Steel Mills achieved another milestone by successfully delivering and installing a high-performance block making machine at the Bhasha Dam Project site