Silver Steel Mills

Factories & plants

portfolio-single-feature-img

Best Innovations in Factory & Plant Construction by Silver Steel Mills

Silver Steel Mills leads the way in prefabricated factory buildings and industrial plant construction in Pakistan, combining engineering precision with modern steel structure techniques. We specialize in designing and fabricating custom steel plants, warehouses, manufacturing units, and large-scale industrial facilities that are strong, cost-efficient, and fast to deploy.

“We don’t just build factories — we build foundations for industrial success.”
Projects Head, Silver Steel Mills

Industrial Facilities Designed for Performance

Our factory and plant construction solutions include:

  • 🏭 Steel Factory Sheds

  • 🧱 Concrete Batching Plants

  • 🏗️ Prefabricated Warehouses

  • 🛠️ Heavy Industry Production Units

  • ⚙️ Dairy Farm Sheds and Processing Units

  • 🔧 Textile, Pharmaceutical & Chemical Manufacturing Sheds

Each project is tailored to client operations, with an emphasis on ventilation, load-bearing capacity, workflow space, and automation integration.


Features of the Factories & Plants Project

✅ Prepare Documentation

We provide detailed CAD drawings, structural analysis reports, and equipment layout plans.

✅ Brand Consistency

Your plant’s signage, color themes, and operational zoning are incorporated into the architectural model.

✅ Quality Control System

Steel structures undergo X-ray welding inspection, bolt torque testing, paint adhesion tests, and surface coating quality checks.

Features of Project

Prepare Documentation
Brand Consistency
Quality Control System
Prepare Documentation
Brand Consistency
Quality Control System
portfolio-single-col-img2

Latest Factory Project: 30,000 Sqft Steel Structure in Lahore

This industrial project included:

  • Prefabricated steel frame using I-beams and H-sections

  • 50 mm insulated sandwich panel walls and roofing

  • Integrated mezzanine floor and crane beam

  • Fire-resistant paints and smoke-vent roofing

  • Drainage, foundation bolts, and electrical provisions

We delivered the project in 50 days, reducing civil work time by 70% compared to traditional construction.


Working Process

01 Step

Design and Planning

Clients get access to architects, civil engineers, and 3D visualization tools to finalize layout and expansion flexibility.

02 Step

Component Sourcing

We use grade-A steel, pre-galvanized purlins, PEB-compatible insulation, and internationally certified welding consumables.

03 Step

Testing and Quality

Each structure is tested for wind uplift, load deflection, earthquake resistance, and temperature control using industry benchmarks.

04 Step

Final Assembly

Our on-site team manages the assembly using boom cranes, torque equipment, and certified welders — ensuring ISO-compliant delivery.

Working Process

Demoralized voluptatum deleniti atque corrupti dolores quas molestias excepturi sint occaecati.

01
Step

Design and Planning

02
Step

Component Sourcing

03
Step

Testing and Quality

04
Step

Final Assembly

Other Specialties in Factory & Plant Construction

Silver Steel Mills also offers:

We serve as a leading PEB company in Lahore, offering pre-fabricated structures for factories and plants that demand operational performance and rapid construction timelines.

Project Information

Completely synergize resource taxing relationships via premier.

Client Name

John Henry

Category

Metallurgy

Start Time

01 Jan, 2024

End Time

26 Apr, 2024

Budget

$20,00,500

Location

42 Mamnoun Street, UK

Social Links

Completely synergize resource taxing.

Have a
project in
mind?