Silver Steel Mills

Metal Industry

Best Innovations in Metal Industry Structures by Silver Steel Mills

Silver Steel Mills is a pioneer in delivering custom-built steel structures for the metal industry in Pakistan. From steel melting units and rolling mills to metal fabrication plants, our pre-engineered and prefabricated solutions ensure faster setup, greater efficiency, and long-term durability. We help metal manufacturers scale their production with industrial sheds, warehouses, and specialized layouts tailored for molten metal operations, heavy machinery, and safety compliance.

We build the backbone of Pakistan’s metal industry with precision-engineered steel solutions.”

– Director, Industrial Projects

Features of Project

Prepare Documentation
Brand Consistency
Quality Control System
Prepare Documentation
Brand Consistency
Quality Control System
portfolio-single-col-img2

Working Process

01
Step

Design and Planning

02
Step

Component Sourcing

03
Step

Testing and Quality

04
Step

Final Assembly

Metal Industry Infrastructure We Deliver

  • 🔩 Steel Rolling Mill Buildings

  • 🔥 Furnace & Melting Plant Structures

  • 🧱 Billet & Ingot Casting Shed Layouts

  • 🏭 Prefabricated Fabrication Units

  • ⚙️ Structural Steel Plants

  • 🛠️ Heavy Machine Workshops

  • 🔧 Pipe & Tube Manufacturing Facilities

  • 🚛 Loading Bays & Raw Material Yards

Our structures are designed to withstand high heat zones, heavy vibrations, overhead cranes, and 24/7 industrial operations.


Features of the Metal Industry Project

✅ Prepare Documentation

Includes customized mechanical layout drawings, crane girder integration, and foundation bolt plans.

✅ Brand Consistency

We ensure all production zones, branding, safety signage, and material handling systems follow client identity and flow.

✅ Quality Control System

We use non-destructive testing (NDT), crack detection, laser alignment, and coating inspections for all structures.


Recent Highlight: Steel Rolling Mill Structure – Gujranwala

A 40,000 sq ft metal industry plant constructed with:

  • 100-ton crane beam capacity

  • Heat-resistant sandwich panels

  • Steel deck roofing with exhaust stacks

  • Emergency ventilation design

  • 15-meter height with multiple gantry levels

  • Insulated control room & foundry section

This facility was delivered in just 65 days with 75% cost savings compared to traditional RCC methods.


Working Process

01 Step

Design and Planning

We consider thermal zones, fire zones, safety corridors, and equipment clearance in every design.

02 Step

Component Sourcing

Specialized metals like stainless structural steel, galvanized coils, HR plates, and fire-retardant paint systems are procured from vetted sources.

03 Step

Testing and Quality

Each metal industry project is tested for load cycles, thermal expansion tolerance, and shock resistance.

04 Step

Final Assembly

Prefabricated units are shipped and assembled onsite using welding cranes, mobile scissor lifts, and bolt anchoring systems under expert supervision.

Project Information

Completely synergize resource taxing relationships via premier.

Client Name

John Henry

Category

Metallurgy

Start Time

01 Jan, 2024

End Time

26 Apr, 2024

Budget

$20,00,500

Location

42 Mamnoun Street, UK

Social Links

Completely synergize resource taxing.

Have a
project in
mind?