News Office Building

The “Best Innovations in Metallurgy” project, executed for DHA Multan’s Industrial Division, was a comprehensive undertaking focused on upgrading the region’s metallurgical infrastructure. Our objective was to implement modern manufacturing practices that elevate material strength, enhance energy efficiency, and ensure sustainable production standards.

Our team designed and developed state-of-the-art processing lines for alloy treatment, casting, and heat resistance improvement, catering to both civil and defense-grade applications. The project combined technological expertise with deep industry knowledge, resulting in a robust, long-lasting solution tailored to client needs.

We believe innovation is not just about technology—it's about solving real-world
challenges with intelligence, precision, and vision.

Project Head Engineer

Features of Project

Key Deliverables

  • Custom Alloy Development: Designed and tested new metal compositions with high thermal and mechanical resistance.

  • Process Automation: Integrated smart control systems for real-time temperature monitoring and process adjustments.

  • Sustainable Operations: Reduced carbon emissions by 28% through energy-optimized furnace systems.

  • Industrial Training: Delivered hands-on workshops to train in-house technicians on system operation and maintenance.

Prepare Documentation
Brand Consistency
Quality Control System
Prepare Documentation
Brand Consistency
Quality Control System
portfolio-single-col-img2

Features of the Project

  • Advanced Metallurgical Design & Simulation

  • On-site Furnace Installation and Testing

  • ISO-Compliant Quality Control Procedures

  • Full Technical Documentation Provided

  • Environmental and Safety Compliance

  • Client Consultation and Feedback Integration


Working Process

Step 01 – Planning & Consultation
Initial assessments were conducted through field surveys and material analysis to align with DHA’s operational goals.

Step 02 – Design & Engineering
Using CAD and simulation software, we developed comprehensive system layouts including material flow and ventilation schemes.

Step 03 – Procurement & Assembly
All components were sourced from certified vendors and assembled on-site under strict supervision.

Step 04 – Testing & Commissioning
The plant was subjected to rigorous operational testing, including load tests, failure simulation, and calibration.


Project Outcome

The plant now runs at 95% operational efficiency, producing over 12 tons of treated alloy per day. It has positioned DHA Multan as a regional leader in sustainable industrial manufacturing, and serves as a model project for future expansions in metallurgy and materials engineering.

Working Process

Working Process

1. Initial Planning:
Conducted site surveys and defined technical requirements based on client needs.

2. Design & Engineering:
Developed custom metallurgical systems using CAD and simulation tools.

3. Equipment Installation:
Installed alloy treatment units and automated process control systems on-site.

4. Testing & Handover:
Performed final testing and quality checks before handing over to the client team.

01
Step

Design and Planning

The project began with in-depth planning and layout design, focusing on process efficiency, material flow, and equipment placement to ensure optimal functionality and scalability.
02
Step

Component Sourcing

High-quality components were sourced from trusted suppliers to ensure durability, performance, and compliance with industry standards.
03
Step

Testing and Quality

Testing and Quality Each component underwent rigorous testing and quality checks to meet safety standards and ensure optimal functionality throughout the project lifecycle.
04
Step

Final Assembly

All verified components were integrated with precision, ensuring seamless operation and alignment with project specifications.

Other Speciality

The project featured innovative design approaches, efficient resource utilization, and strict adherence to international standards. Our team maintained exceptional attention to detail, ensuring enhanced durability, performance, and long-term reliability.

Project Information

Streamlined resources and delivered high-quality solutions efficiently, ensuring client satisfaction.

Client Name

DHA

Category

Steel Shed

Start Time

14 Jan, 2020

End Time

26 Apr, 2020

Budget

Sft Base

Location

Dha Multan

Social Links

Completely synergize resource taxing.

Have a
project in
mind?