PROJECT QUOTATION REPORT
Quotation For:
N/A
N/A
Structure Layout Drawing
SILVER STEEL MILLS
silversteelmills.com | +92 324 9500004 | Lahore, Pakistan
PROJECT QUOTATION REPORT
Estimated Costs Breakdown
| Item | Value |
|---|---|
| Main Frame Steel Weight (kg): | 0 kg |
| Secondary Steel Weight (Purlin + Girt) (kg): | 0 kg |
| Total Cladding Area (sq ft): | 0 sq ft |
| Cladding Details: | N/A |
| Cladding Material Cost (PKR): | PKR 0 |
| Accessories Cost (PKR): | PKR 0 |
| Total Material Cost (PKR) (Frame + Secondary Steel + Cladding + Accessories): | PKR 0 |
| Erection/Labor Cost (PKR): | PKR 0 |
| **Total Project Cost (PKR):** | PKR 0 |
This estimation is based on the provided rates and standard PEB engineering principles. Actual rates and material requirements may vary based on your project and market fluctuations.
SILVER STEEL MILLS
silversteelmills.com | +92 324 9500004 | Lahore, Pakistan
PROJECT QUOTATION REPORT
Terms and Conditions
1. Design Codes and Loads
All structural design loads and engineering codes are based on current construction regulations, as per Section 1. Any changes requested by the client will require a revised quotation, including updated costs and timelines.
2. Drawings and Approvals
This quotation and the latest drawings supersede all previous documents, discussions, or revisions. Any changes in parameters during or after drawing approval will result in revised costs and a new delivery schedule, subject to both technical and commercial approval.
3. Material Supply & Delivery
Materials will be delivered promptly upon 100% advance payment. Fabrication can be managed at both the factory and the site, depending on project needs. Storage space for delivered materials must be provided by the client.
4. Payment Terms
A) Material Supply
100% Advance Payment upon order confirmation.
B) Erection Work (Step-by-Step Payment Schedule)
| Stage | Payment | Description |
|---|---|---|
| 1 | 40% | Upon confirmation of erection order |
| 2 | 30% | After fabrication of main frames |
| 3 | 20% | After erection of roofing, cladding, and structural works |
| 4 | 10% | Upon final completion and client approval |
Thank you for considering Silver Steel Mills for your project. We look forward to serving you.